Execution and installation of metal structure for 5 accumulator platforms/lines (CC41-CC45). The project started in the middle of 2022 and was completed in January 2023. For the last platforms, we were also responsible for the installation of the corresponding equipment.
5 identical platforms:
- Cell cover system (positioning, reassembly, leveling)
- Fan substructure + fan installation (with welding on steel beam)
- Air handling unit (without ducts)
- Paint hoses
- Tray system on metal structure for operator panel
- Gratings on metal structure
- Control units for hot and cold water (pipes not included)
- Sub-distributors for air supply
- Air supply pipes (Festo CQ plastic pipe)
- Supports for workpieces on conveyor